Risk, supply-chain & logistics kernels

Portfolio/returns-series risk metrics (VaR, Sharpe, drawdown) alongside five independent operations-research modules for demand forecasting, EOQ/safety-stock, procurement economics, logistics KPIs, an

Six modules for the arithmetic behind planning and measuring a physical or financial operation: how risky a return series has been, how much of something to order and when, how well a purchasing function is negotiating, how well a fleet and warehouse are running, and how a road or intersection behaves under load. None of the six import each other, and — with one notable exception below — none share a function name with another; the pairing is topical (a finance-risk module next to five operations-research modules that all eventually touch "how much stock to keep on hand"), not architectural. Every function in all six takes and returns plain Float64 scalars or List[Float64] — no structs, no status-code vocabulary.

from algenta import MojoRuntime

runtime = MojoRuntime(mode="local")

# Five returns, risk-free rate 0.0 -- mean 0.04, population std 0.014142135623730951
returns = [0.05, 0.03, 0.04, 0.06, 0.02]
runtime.execute("risk", "sharpe_ratio", [returns, 0.0])["result"]
# 2.8284271247461903 -- (mean - risk_free) / population standard deviation

# Annual demand 1,000 units, $50 to place an order, $2/unit/year to hold one
runtime.execute("inventory", "eoq", [1000.0, 50.0, 2.0])["result"]
# 223.60679774997897 -- sqrt(2 * demand * order_cost / holding_cost)

The modules

Module
What it does

risk

Portfolio and returns-series risk metrics: historical value-at-risk, conditional VaR (Expected Shortfall), max drawdown and drawdown series, Sharpe/Sortino/Calmar ratios, CAPM beta and Jensen's alpha, information ratio, and downside deviation.

supply_chain

Demand forecasting and production-lot economics: lead-time demand, the bullwhip ratio, forecast error (MAE/MAPE/bias/tracking signal), economic production quantity, type-1/type-2 service levels, total cost of ownership, and moving-average/exponential-smoothing forecasts.

inventory

Order-quantity and safety-stock formulas: EOQ, reorder point, safety stock from a z-score, total inventory cost, the newsvendor critical-ratio quantity, a normal-CDF service level, ABC classification, days of supply, inventory turnover, fill rate, and periodic-review order-up-to quantity.

procurement

Purchasing economics: total cost of ownership, price variance and PPV%, inventory turnover and days inventory outstanding, EOQ, reorder point, safety stock, weighted supplier scoring, savings percentage, maverick-spend ratio, and annualized early-payment discount.

logistics

Warehouse and fleet KPI ratios: vehicle and warehouse utilization, order fill rate, perfect-order rate, inventory turns, days of supply, cost per unit shipped, on-time delivery rate, dwell time, cross-dock throughput, route efficiency, and carbon per tonne-km.

transportation

Traffic and vehicle-operations engineering: level-of-service density, highway and intersection capacity, travel time, Webster-style signal delay, car-following headway, braking stopping distance, speed-dependent fuel consumption, passenger-car equivalents, deterministic queue length, vehicle operating cost, and crash rate.

risk is portfolio risk, not options risk

The hint for this page asked to check risk against the already-documented finance-domain option_pricing/option_greeks_batch content in Batched chain greeks. Reading both source files, they turn out to be unrelated except by the word "risk" appearing in both domains' vocabulary. option_pricing.mojo implements Black-Scholes pricing, the option greeks (delta/gamma/vega/theta), binomial trees, put-call parity, and implied volatility — derivatives pricing for a single contract given spot, strike, rate, time, and volatility. risk.mojo implements none of that: every function here takes a List[Float64] of historical returns (or portfolio values) and produces a scalar describing how that series behaved — value-at-risk, drawdown, a risk-adjusted ratio, or a regression coefficient against a benchmark. There is no shared function name, no shared parameter shape (risk never takes a strike price or a volatility surface; option_pricing never takes a returns series), and neither module imports the other. A caller pricing an option's Greeks wants option_pricing/option_greeks_batch; a caller measuring a portfolio's historical risk wants risk.

Function
What it does

value_at_risk(returns, confidence)

Historical VaR: linearly-interpolated (1-confidence) percentile of the sorted return series, negated so a loss reports positive.

conditional_var(returns, confidence)

CVaR / Expected Shortfall: mean of the returns at or below the VaR threshold, negated the same way.

max_drawdown(values)

Largest peak-to-trough fractional decline across a value series.

drawdown_series(values)

The same fractional decline computed at every point, not just the maximum.

sharpe_ratio(returns, risk_free=0.0)

(mean - risk_free) / population_std; 0.0 if the series has essentially no spread.

sortino_ratio(returns, target=0.0)

(mean - target) / downside_deviation; penalizes only sub-target returns.

beta(asset_returns, market_returns)

CAPM beta: cov(asset, market) / var(market).

alpha(asset_returns, market_returns, risk_free=0.0)

Jensen's alpha: mean(asset) - rf - beta * (mean(market) - rf).

information_ratio(returns, benchmark)

mean(excess) / std(excess) where excess = returns - benchmark, element-wise.

calmar_ratio(returns, values)

(mean(returns) * 252) / max_drawdown(values) — an annualized-return-over-drawdown ratio.

downside_deviation(returns, target=0.0)

sqrt(mean(min(r - target, 0)^2)), dividing by the full sample size n, not just the count of sub-target observations.

Every number below is drawn from the real pinned suite, tests/mojo/test_wave24.mojo (the auto-generated mojo/tests/libs/test_risk.mojo also exists, smoke-testing every function at literal 0.5 arguments for finiteness only). On the return series [0.05, 0.03, 0.04, 0.06, 0.02], sharpe_ratio computes a mean of 0.04 and a population standard deviation (divisor n, not n-1) of 0.014142135623730951, giving 2.8284271247461903 — independently reproducible in plain Python with no library beyond math.sqrt. On the ten-point series [-0.10, -0.05, 0.02, 0.03, 0.04, 0.05, 0.06, 0.07, 0.08, 0.10], value_at_risk(returns, 0.95) interpolates between the sorted series' 0th and 1st entries at fractional index (1-0.95)*(10-1) = 0.45 — -(-0.10*0.55 + -0.05*0.45) = 0.0775 — and conditional_var at the same confidence averages every return at or below that -0.0775 return level, which is always >= the plain VaR since it is averaging in the whole left tail, not just the boundary. On the value path [100, 90, 95, 80, 100], max_drawdown reports 0.2 (peak 100, trough 80), and drawdown_series reports the same trajectory point-by-point: [0.0, 0.1, 0.05, 0.2, 0.0]. beta(returns, returns) — an asset regressed against itself — returns exactly 1.0, and alpha(returns, returns, 0.0) — an asset that never outperforms its own benchmark — returns exactly 0.0, both algebraic identities that would hold for any input series, not just the one in the test.

downside_deviation's denominator is the whole sample, not the shortfall count. Reading the body directly — ss += d*d only when d < 0.0, then sqrt(ss / Float64(n)) where n is len(returns) regardless of how many terms were actually negative — this module's downside deviation is smaller than a version that divided by the count of sub-target observations alone. A series with one bad return out of five contributes only that one squared deviation but still divides by 5, not 1; sortino_ratio, built on this function, inherits the same convention.

supply_chain: forecasting and production-lot economics

Function
What it does

lead_time_demand(demand_rate, lead_time)

demand_rate * lead_time.

bullwhip_effect(demand_variance, order_variance)

order_variance / demand_variance; ratio > 1 means orders amplify the underlying demand signal.

forecast_error_mae(actual, forecast)

Mean absolute error between two equal-length series.

forecast_error_mape(actual, forecast)

Mean absolute percentage error, skipping any actual value of 0.

forecast_bias(actual, forecast)

mean(forecast - actual); positive means systematic over-forecasting.

tracking_signal(actual, forecast)

Cumulative forecast error divided by mean absolute deviation of that error.

economic_production_qty(demand, setup_cost, holding_cost, production_rate)

EPQ: sqrt(2*D*S / (H*(1 - D/P))); 0.0 if the production rate does not exceed demand.

total_cost_of_ownership(purchase, ordering, holding, shortage)

Plain sum of the four named cost components.

service_level_type1(stockout_probability)

1 - P(stockout) — a cycle service level.

fill_rate_type2(expected_shortage, demand)

1 - E[shortage] / demand — a Type 2 (unit) fill rate.

moving_average_forecast(data, periods)

Average of the last periods observations, clamped to however much data actually exists.

exponential_smoothing_forecast(data, alpha)

Single exponential smoothing, seeded with F(1) = data[0].

The real pinned suite, tests/mojo/test_wave44.mojo (alongside the auto-generated mojo/tests/libs/test_supply_chain.mojo, which only checks finiteness at 0.5 literals), works a full worked chain: forecast_error_mae([10, 20, 30], [12, 18, 33]) gives 7/3 ≈ 2.333; forecast_bias on the same shape ([10,20,30] vs. [12,22,32], every forecast two units high) gives exactly 2.0; and tracking_signal([100,100,100], [105,110,103]) gives exactly 3.0 — a cumulative error of 18 over a mean absolute deviation of 6. moving_average_forecast([10, 20, 30, 40], 3) averages the last three points to 30.0, and the same data with periods=2 gives 35.0. exponential_smoothing_forecast([10, 20, 30], 0.5) seeds at 10.0, updates to 0.5*20 + 0.5*10 = 15.0, then 0.5*30 + 0.5*15 = 22.5 — matching the pinned 22.5 exactly — and a lower alpha=0.1 run stays closer to the early data (< 22.5), which is exactly what a slower-adapting smoothing constant should do.

inventory: EOQ, safety stock, and the newsvendor model

Function
What it does

eoq(demand, order_cost, holding_cost)

sqrt(2*D*S/H); 0.0 if holding_cost <= 0.

reorder_point(demand_rate, lead_time, safety_stock)

demand_rate*lead_time + safety_stock.

safety_stock(z_score, demand_std, lead_time)

z * demand_std * sqrt(lead_time).

total_inventory_cost(demand, order_qty, order_cost, holding_cost)

(D/Q)*S + (Q/2)*H; 0.0 if order_qty <= 0.

newsvendor_qty(mean_demand, std_demand, cost_under, cost_over)

mean + z*std, where z = Φ⁻¹(cost_under / (cost_under + cost_over)) via a Beasley-Springer-Moro rational approximation.

service_level(z_score)

Standard normal CDF at z_score, via an Abramowitz-and-Stegun polynomial approximation.

abc_classify(values)

Top-20%-cumulative-value items get class 0 (A), next up to 50% get class 1 (B), the rest get class 2 (C).

days_of_supply(inventory, daily_demand)

inventory / daily_demand; 0.0 if daily_demand <= 0.

inventory_turnover(cogs, avg_inventory)

cogs / avg_inventory; 0.0 if avg_inventory <= 0.

fill_rate(orders_filled, total_orders)

orders_filled / total_orders (integer inputs); 0.0 if total_orders <= 0.

periodic_review_order(target, on_hand, on_order)

max(0, target - on_hand - on_order).

The real pinned suite is tests/mojo/test_wave32.mojo (the auto-generated mojo/tests/libs/test_inventory.mojo only checks finiteness). eoq(1000.0, 50.0, 2.0) gives sqrt(50000) ≈ 223.607, and feeding that same quantity back into total_inventory_cost(1000.0, 223.607, 50.0, 2.0) gives ≈ 447.21 — the minimum of the cost curve, confirmed by the test against two other order quantities (100 and 500) that both cost more. safety_stock(1.96, 10.0, 4.0) gives 1.96 * 10 * sqrt(4) = 39.2. service_level(1.96) ≈ 0.975 and service_level(-1.96) ≈ 0.025 — the approximation is accurate to about four decimal places against the true normal CDF (independently checked: the real error function gives 0.9750021... against this module's 0.9750022...).

abc_classify's thresholds are on cumulative value share, not each item's own share of the total — which produces a result that reads oddly until the rule is stated precisely. Five items valued [50, 5, 100, 10, 35] (total 200) sort descending as 100, 50, 35, 10, 5. The 100-value item alone is half the portfolio, but it is graded on where its own cumulative slice ends (100/200 = 0.50), which lands exactly on the <= 0.20 → A boundary's neighbor: 0.50 clears the 0.20 cutoff for A but still qualifies for B (<= 0.50), so the single highest-value item — fully 50% of total value — is classified 1 (B), not 0 (A). Every item after it lands past the 0.50 cutoff and is classified 2 (C), including the second-highest-value item (50, class C) which by itself is a quarter of total value. With only five items and one dominant value, the ABC scheme's 20/30/50 cumulative bands compress almost the entire portfolio into B and C; the classification is about where an item falls in the sorted cumulative curve, not about its rank or its own percentage of the total.

procurement: cost variance and supplier scoring

Function
What it does

total_cost_of_ownership(purchase, operating, maintenance, disposal)

Plain sum of the four named lifecycle-cost components.

price_variance(actual_price, standard_price, quantity)

(actual - standard) * quantity.

purchase_price_variance_pct(actual, standard)

(actual - standard) / standard * 100; 0.0 if standard == 0.

inventory_turnover(cogs, avg_inventory)

cogs / avg_inventory; 0.0 if avg_inventory == 0.

days_inventory_outstanding(inventory_turnover_val)

365 / inventory_turnover; 0.0 if the input is 0.

economic_order_quantity(demand, ordering_cost, holding_cost)

sqrt(2*D*S/H); 0.0 only if holding_cost == 0 exactly.

reorder_point(daily_demand, lead_time, safety_stock_val)

daily_demand*lead_time + safety_stock_val.

safety_stock(z_score, demand_std, lead_time)

z * demand_std * sqrt(lead_time).

supplier_score_weighted(scores_sum, weights_sum)

scores_sum / weights_sum; 0.0 if weights_sum == 0.

savings_percentage(old_price, new_price)

(old - new) / old * 100; 0.0 if old_price == 0.

maverick_spend_ratio(off_contract, total_spend)

off_contract / total_spend * 100; 0.0 if total_spend == 0.

payment_discount_annualized(discount_pct, full_days, discount_days)

(d/(1-d)) * (365/(full_days-discount_days)) * 100 — the annualized cost of forgoing an early-payment discount.

The real pinned suite, tests/mojo/test_wave82.mojo (alongside the auto-generated mojo/tests/libs/test_procurement.mojo), works a "2/10 net 30" early-payment discount end to end: payment_discount_annualized(2.0, 30.0, 10.0) computes d = 0.02, a 20-day gap between the discount window and full payment terms, and returns (0.02/0.98) * (365/20) * 100 ≈ 37.245% — the implied annualized interest rate of not taking a 2% discount for paying 20 days early, high enough that most treasury policies would take the discount. economic_order_quantity(10000.0, 50.0, 2.0) gives sqrt(500000) ≈ 707.107, and safety_stock(1.96, 20.0, 7.0) gives 1.96 * 20 * sqrt(7) ≈ 103.72.

logistics: KPI ratios with no guard clauses at all

Function
What it does

vehicle_utilization(loaded_km, total_km)

(loaded/total) * 100.

order_fill_rate(filled_orders, total_orders)

(filled/total) * 100.

perfect_order_rate(perfect, total)

(perfect/total) * 100.

inventory_turns(cogs, avg_inventory)

cogs / avg_inventory.

days_of_supply(avg_inventory, daily_demand)

avg_inventory / daily_demand.

warehouse_utilization(used_space, total_space)

(used/total) * 100.

cost_per_unit_shipped(total_cost, units_shipped)

total_cost / units_shipped.

on_time_delivery_rate(on_time, total_deliveries)

(on_time/total) * 100.

dwell_time(arrival_time, departure_time)

departure - arrival, hours.

cross_dock_throughput(items_processed, hours)

items / hours.

route_efficiency(actual_distance, optimal_distance)

(optimal/actual) * 100.

carbon_per_tonne_km(total_co2_kg, tonnes, km)

co2 / (tonnes * km).

Every number here comes from the real pinned suite, tests/mojo/test_wave99.mojo (alongside the auto-generated mojo/tests/libs/test_logistics.mojo): vehicle_utilization(800.0, 1000.0) = 80.0, inventory_turns(1000000.0, 200000.0) = 5.0, dwell_time(8.0, 14.0) = 6.0, cross_dock_throughput(5000.0, 8.0) = 625.0, and carbon_per_tonne_km(50.0, 10.0, 100.0) = 0.05 (50 kg CO2 moving 10 tonnes 100 km), each matching the formula above exactly.

transportation: engineering formulas, distinct from two other traffic-flavored functions in this codebase

The hint for this page asked to check transportation against the already-documented traffic_signal/urban_planning content. Both of those modules do compute traffic-flavored numbers, but neither one duplicates anything in transportation, and all three use the phrase "level of service" for a genuinely different computation:

  • urban_planning.traffic_level_of_service(volume, capacity) (documented in Building and facility systems kernels) is a bare volume-to-capacity ratio — a coarse, single-number congestion check a city planner runs against a whole corridor or zoning district.

  • traffic_signal.level_of_service_delay(delay_sec) (documented in Transportation and hazard-safety kernels) classifies a signalized intersection's average per-vehicle delay into the HCM's lettered A-F bands.

  • transportation.level_of_service_density(flow, speed), documented on this page, is neither of those: it is flow / speed, a vehicle-density number (veh/km/lane) in the Greenshields tradition used to characterize a freeway or highway segment, not an intersection or a zoning district, and it returns a raw density, not a classification letter.

No function name is shared among the three modules, none imports another, and the formulas compute three different physical quantities that all happen to be called some flavor of "traffic level of service" in transportation-engineering literature.

Function
What it does

level_of_service_density(flow, speed)

flow / speed; 0.0 if speed ≈ 0.

highway_capacity(lanes, capacity_per_lane)

lanes * capacity_per_lane.

travel_time(distance, speed)

distance / speed; 0.0 if speed ≈ 0.

delay_at_signal(cycle_length, green_ratio, arrival_rate, service_rate)

The same simplified Webster delay formula as traffic_signal.delay_uniform, clamping the flow ratio λ/μ at 1.0.

headway(speed, reaction_time, deceleration)

reaction_time + speed / (2*deceleration); falls back to just reaction_time if deceleration ≈ 0.

stopping_distance(speed, reaction_time, friction, grade)

speed*reaction_time + speed^2 / (2*g*(friction+grade)), g = 9.81 m/s².

fuel_consumption_rate(base_rate, speed, optimal_speed)

base_rate * (1 + 0.01*(speed-optimal_speed)^2).

passenger_car_equivalent(trucks_pct, terrain_factor)

1 + trucks_pct*(terrain_factor - 1).

intersection_capacity(saturation_flow, green_ratio)

saturation_flow * green_ratio.

queue_length_estimate(arrival_rate, service_rate, time_period)

max(0, (arrival_rate - service_rate) * time_period).

vehicle_operating_cost(fuel_cost, distance, fuel_efficiency)

fuel_cost * distance / fuel_efficiency; 0.0 if fuel_efficiency ≈ 0.

crash_rate(crashes, vmt_millions)

crashes / vmt_millions; 0.0 if vmt_millions ≈ 0.

Every number here is drawn from the real pinned suite, tests/mojo/test_wave72.mojo (alongside the auto-generated mojo/tests/libs/test_transportation.mojo, finiteness-only): a four-lane highway at 2,000 veh/hr/lane gives highway_capacity(4.0, 2000.0) = 8000.0; a 90-second signal cycle with a 0.4 green ratio and a 0.6 volume-to-capacity ratio (λ=0.3, μ=0.5) gives delay_at_signal(90.0, 0.4, 0.3, 0.5) = 0.5*90*0.36/0.76 ≈ 21.32 seconds/vehicle; a 20 m/s vehicle with a 2.5-second reaction time on level, dry-ish pavement (friction=0.35) gives stopping_distance(20.0, 2.5, 0.35, 0.0) = 50 + 400/6.867 ≈ 108.25 m; and 10% trucks on rolling terrain (terrain_factor=2.5) gives passenger_car_equivalent(0.10, 2.5) = 1.15.

Where the six modules literally duplicate each other

Two operations-adjacent formulas appear, verbatim, in more than one module on this page, and one function name is reused for two different real-world quantities:

  • eoq/economic_order_quantity — inventory and procurement implement the identical sqrt(2*demand*order_cost/holding_cost) formula under two different names, differing only in the guard clause noted above.

  • safety_stock and reorder_point — inventory and procurement implement these two formulas identically, parameter-for-parameter (safety_stock even keeps the exact same argument names in both modules).

  • inventory_turnover/inventory_turns — inventory, procurement, and logistics all compute cogs / avg_inventory; only the first two guard the zero-denominator case.

  • days_of_supply — inventory and logistics both compute inventory / daily_demand; again, only inventory's guards.

  • total_cost_of_ownership is the same function name used for two unrelated cost breakdowns. supply_chain.total_cost_of_ownership(purchase, ordering, holding, shortage) sums the four classic inventory-model cost buckets. procurement.total_cost_of_ownership(purchase, operating, maintenance, disposal) sums four lifecycle-asset cost buckets instead — the same four-argument-sum shape, but none of the last three arguments mean the same thing between the two modules. A caller who reads only the function name and return type, without checking which module it came from, cannot tell which cost model it computed.

  • Two different "service level" definitions coexist deliberately. supply_chain.service_level_type1(stockout_probability) = 1 - stockout_probability is a plain complement of an input probability the caller already estimated elsewhere. inventory.service_level(z_score) runs a full normal-CDF approximation on a z-score. Neither calls the other, and neither is "the" service level function — they answer the question from two different starting points (a stockout probability you already have, vs. a safety-stock z-score you want translated into a probability).

Verification

All six modules have real, hand-verified pinned test suites layered on top of their auto-generated per-module smoke tests — this is not a "smoke tests only" family:

Module
Auto-generated smoke test
Real pinned suite

risk

mojo/tests/libs/test_risk.mojo

tests/mojo/test_wave24.mojo

supply_chain

mojo/tests/libs/test_supply_chain.mojo

tests/mojo/test_wave44.mojo

inventory

mojo/tests/libs/test_inventory.mojo

tests/mojo/test_wave32.mojo

procurement

mojo/tests/libs/test_procurement.mojo

tests/mojo/test_wave82.mojo

logistics

mojo/tests/libs/test_logistics.mojo

tests/mojo/test_wave99.mojo

transportation

mojo/tests/libs/test_transportation.mojo

tests/mojo/test_wave72.mojo

The auto-generated files each call every function once with literal 0.5 arguments (or a small literal list, for the List[Float64] parameters) and check only that the result is finite — they pin no specific numeric output. Every number given above comes from a real pinned suite or was independently re-derived in plain Python against the formula in the corresponding mojo/engine/*.mojo file, and can be reproduced by re-running the same arithmetic.

Next: see Batched chain greeks for the unrelated option_pricing/ option_greeks_batch finance modules, or Transportation and hazard-safety kernels for traffic_signal's intersection-timing formulas, or browse the Runtime library catalog for every module and function.